Wongm's Rail Gallery » HCMT High Capacity Signalling testing at Epping

Open equipment cabinet onboard HCMT set 18 during HCS testing on the Mernda line

In album: HCMT High Capacity Signalling testing at Epping

Open equipment cabinet onboard HCMT set 18 during HCS testing on the Mernda line

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 25 October 2021 20:55 PM
Exposure Time: 1/100 sec
Aperture Value: f/5.6
Viewed 118 times
(21 times this week, 82 times this month, 118 times this year)