Wongm's Rail Gallery » HCMT High Capacity Signalling testing at Epping

HCMT set 18 departs South Morang on a 'sweep' on the line to Epping

In album: HCMT High Capacity Signalling testing at Epping

The line needs to be confirmed as clear before HCS testing can commence
HCMT set 18 departs South Morang on a 'sweep' on the line to Epping

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 25 October 2021 21:56 PM
Exposure Time: 1/60 sec
Aperture Value: f/4
Viewed 55 times
(6 times this week, 33 times this month, 55 times this year)