Wongm's Rail Gallery » HCMT High Capacity Signalling testing at Epping

Signal EPP126 at Epping is extinguished, indicating to the driver of HCMT set 18 to proceed according to CBTC cab signalling aspects

In album: HCMT High Capacity Signalling testing at Epping

Signal EPP126 at Epping is extinguished, indicating to the driver of HCMT set 18 to proceed according to CBTC cab signalling aspects

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 25 October 2021 22:08 PM
Exposure Time: 1/25 sec
Aperture Value: f/4
Viewed 78 times
(8 times this week, 34 times this month, 78 times this year)