Wongm's Rail Gallery » HCMT High Capacity Signalling testing at Epping

Trackside Radio Assembly installed atop signal EPP121 at Epping

In album: HCMT High Capacity Signalling testing at Epping

2.4 Ghz radio antennas that are part of the new communications-based train control (CBTC) system
Trackside Radio Assembly installed atop signal EPP121 at Epping

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Monday 25 October 2021 22:24 PM
Exposure Time: 1/20 sec
Aperture Value: f/4
Viewed 364 times
(1 time this week, 5 times this month, 60 times this year)