Wongm's Rail Gallery » HCMT High Capacity Signalling testing at Epping

CBTC Block Marker sign at the down end of the 'Virtual Station'

In album: HCMT High Capacity Signalling testing at Epping

The 'Virtual Station' is used to test station stops under the HCS system
CBTC Block Marker sign at the down end of the 'Virtual Station'

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 25 October 2021 23:00 PM
Exposure Time: 3/10 sec
Aperture Value: f/4
Viewed 74 times
(7 times this week, 32 times this month, 74 times this year)