Wongm's Rail Gallery » High Capacity Metro Train curve testing at Rushall

Tail end of the HCMT set overhangs the platform at Bell

In album: High Capacity Metro Train curve testing at Rushall

The down end of the platform is out of use, but a HCMT set needs it!
Tail end of the HCMT set overhangs the platform at Bell

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Sunday 17 January 2021 21:40 PM
Exposure Time: 1/50 sec
Aperture Value: f/5
Viewed 216 times
(1 time this week, 1 time this month, 2 times this year)