Wongm's Rail Gallery » High Capacity Metro Train curve testing at Rushall

Stopped at the sharpest point of the Rushall curve, and testing staff ready to uncouple the two HCMT sets

In album: High Capacity Metro Train curve testing at Rushall

Stopped at the sharpest point of the Rushall curve, and testing staff ready to uncouple the two HCMT sets

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Thursday 21 January 2021 00:44 AM
Exposure Time: 1/40 sec
Aperture Value: f/4
Viewed 254 times
(1 time this week, 1 time this month, 2 times this year)