Wongm's Rail Gallery » Infrastructure

Infrastructure

Photos of all kinds of rail infrastructure from around Australia

Richmond station

August 09, 2016

A windblown concrete monolith from the 1950s with inadequate passenger interchange passageways and narrow platforms

Second Merri Creek bridge at Clifton Hill

October 26, 2008

Clifton Hill is the junction of the Epping and Hurstbridge lines in inner Melbourne, with a new bridge being built in 2008 across Merri Creek to duplicate the Hurstbridge line tracks.

Southern Cross Station office towers

February 13, 2017

The 664 Collins Street and 699 Bourke Street office towers have been built atop Southern Cross Station platforms 13 through 16g

Spencer Street Station pedestrian subways

March 19, 2017

Until the 2005 redevelopment as Southern Cross Station, passengers at Spencer Street Station used a pedestrian subway to access the platforms, as well as to pass under Spencer Street.

Sunbury electrification project

May 09, 2015

Electrification of the Bendigo line between Sydenham and Sunbury started in 2008, and was completed in 2012. Diggers Rest and Sunbury stations were upgraded, a new stabling yard built at the end of the line, overhead wires were installed above the tracks, and four new traction substations were built.

Swan Hill line stations and infrastructure

June 24, 2006

Swan Hill station yard and facilities, plus a few bits from other places along the line

Tottenham Yard

May 15, 2017

All sorts of stored and damaged wagons clogging up Tottenham Yard in Melbourne's west, with a few operational ones thrown in for good measure

Tram infrastructure of Melbourne

July 03, 2015

Bits and pieces of tramway infrastructure from around the Yarra Trams network in Melbourne

Victoria Dock

September 25, 2011

Rail sidings served two parts of Victoria Dock - wharves 16-23 on the north side, and wharves 1-4 on the south

Webb Dock line

October 05, 2014

Disused railway line in inner Melbourne, opened in the mid 1980s. Running from Melbourne Yard, over the Yarra River to the south bank to Webb Dock, only the line west of CityLink exists today, reserved for future rebuilding

Wycheproof to Dunolly stations and infrastructure

October 12, 2008

Infrastructure from Wycheproof through Teddywaddy, Charlton, Korong Vale and Dunolly

Viewed 472 times (14 times this week, 16 times this month)