In 2013-14 new signalling was installed on the Craigieburn and Flemington Racecourse lines, between Kensington and Essendon stations.

Plastic insulated signal trunking at the up end of Newmarket station

March 19, 2016 09:21 AM
Viewed 141 times
(1 time this week, 6 times this month)

New signals commissioned at the up end of Newmarket station

June 17, 2014 08:18 AM
Viewed 331 times
(2 times this week, 6 times this month)

Insulated rail joint at a former signal location on the Craigieburn line, now bypassed by shunt cables

The former location of the trip arm can also be seen on the right hand side of the tracks

June 12, 2014 08:20 AM
Viewed 449 times
(2 times this week, 6 times this month)

Now-redundant LED signal heads waiting collection beside the Craigieburn line

June 12, 2014 08:20 AM
Viewed 337 times
(1 time this week, 5 times this month)

New signals commissioned on the Craigieburn line at Newmarket station

June 11, 2014 08:16 AM
Viewed 316 times
(2 times this month)

New signal awaiting commissioning at the up end of Showgrounds station

May 19, 2013 10:52 AM
Viewed 461 times
(3 times this month)

New fencing and driver path in place for terminating trains at Essendon platform 1

April 27, 2013 14:02 PM
Viewed 548 times
(2 times this month)

Old signalling still in place at Ascot Vale station

April 11, 2013 08:34 AM
Viewed 509 times
(3 times this month)

Down line resleepered at Ascot Vale station, the up line still to be done

April 11, 2013 08:34 AM
Viewed 506 times
(2 times this month)

Mechanical dwarf #10 at Kensington beside the new LED signal that will replace it

March 30, 2013 09:09 AM
Viewed 397 times
(1 time this week, 3 times this month)

Bagged signals on a brand new folding mast at Ascot Vale

February 11, 2013 08:18 AM
Viewed 419 times
(6 times this month)

New folding mast in place with signal heads at the down end of Ascot Vale

February 11, 2013 08:16 AM
Viewed 496 times
(1 time this month)

New signal post in place at the down end of Ascot Vale

February 04, 2013 08:30 AM
Viewed 407 times
(1 time this week, 3 times this month)

New signal trunking running above the existing trunking at Ascot Vale

February 04, 2013 08:30 AM
Viewed 531 times
(1 time this week, 5 times this month)

Existing signal trunking running along the down line at Newmarket

February 01, 2013 08:32 AM
Viewed 431 times
(5 times this month)

New signal trunking running along the down line at Newmarket

Being installed as part of the resignalling of the inner section of the Craigieburn line

January 31, 2013 17:55 PM
Viewed 408 times
(1 time this week, 1 time this month)

New equipment cupboard bases at Ascot Vale

Installed as part of the resignalling of the inner section of the Craigieburn line

January 31, 2013 08:32 AM
Viewed 323 times
(1 time this week, 2 times this month)

Pair of concrete sleepers with mounting holes for a train stop

Installed as part of the resignalling of the inner section of the Craigieburn line

January 29, 2013 18:02 PM
Viewed 357 times
(1 time this week, 4 times this month)

New folding signal base, beside new concrete sleepers for the train stop

Installed as part of the resignalling of the inner section of the Craigieburn line

January 29, 2013 18:02 PM
Viewed 537 times
(2 times this month)

Detail view of the hollow sleeper

January 29, 2013 18:01 PM
Viewed 844 times
(1 time this week, 5 times this month)

New hollow sleepers installed beside a future signal location at Ascot Vale

January 29, 2013 18:01 PM
Viewed 1005 times
(3 times this month)

Reverse view of the new folding signal base

January 29, 2013 18:01 PM
Viewed 377 times
(3 times this month)

New folding signal base installed at Ascot Vale

Installed as part of the resignalling of the inner section of the Craigieburn line