Wongm's Rail Gallery » Level crossings

Road duplication works underway on the south side of the Cardinia Road level crossing

In album: Level crossings

Road duplication works underway on the south side of the Cardinia Road level crossing

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 8 May 2016 12:07 PM
Exposure Time: 1/800 sec
Aperture Value: f/7.1
Viewed 733 times
(2 times this week, 1 time this month, 144 times this year)