Wongm's Rail Gallery » Level crossings

Road duplication works underway on the south side of the Cardinia Road level crossing

In album: Level crossings

Road duplication works underway on the south side of the Cardinia Road level crossing

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 8 May 2016 12:08 PM
Exposure Time: 1/500 sec
Aperture Value: f/10
Viewed 780 times
(1 time this week, 2 times this month, 83 times this year)