Wongm's Rail Gallery » Melbourne freight terminals ยป Tottenham Yard

Pile of Duratrack recycled plastic sleepers near the Tottenham Triangle

In album: Tottenham Yard

Installed in the ARTC mainline in 2021 as part of a trial by Integrated Recycling, with Monash IRT monitoring instrumented sleepers
Pile of Duratrack recycled plastic sleepers near the Tottenham Triangle

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 10 March 2022 13:13 PM
Exposure Time: 1/200 sec
Aperture Value: f/10
Viewed 95 times
(1 time this week, 3 times this month, 95 times this year)