Wongm's Rail Gallery » Melbourne freight terminals ยป Wagon Storage Yard

Wagon Storage Yard now closed, track being ripped up for the West Gate 'Tunnel' project

In album: Wagon Storage Yard

A ground level road will be built along here to connect Dynon Road to Wurundjeri Way
Wagon Storage Yard now closed, track being ripped up for the West Gate 'Tunnel' project

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 17 November 2019 13:42 PM
Exposure Time: 1/640 sec
Aperture Value: f/16
Viewed 352 times
(3 times this week, 4 times this month, 90 times this year)