East Camberwell substation, the current 1,500 kW of 50 Hz operated equipment commissioned in 1960 inside an existing building

In album: Melbourne railway traction substations

Originally opened on electrification, fed by a 25 Hz supply with three rotary converters providing 9,000 kW capacity
East Camberwell substation, the current 1,500 kW of 50 Hz operated equipment commissioned in 1960 inside an existing building