Wongm's Rail Gallery » Melbourne stations and infrastructure

Camberwell platform 3 regraded, resurfaced and with new drainage installed

In album: Melbourne stations and infrastructure

Camberwell platform 3 regraded, resurfaced and with new drainage installed

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 12 April 2019 18:02 PM
Exposure Time: 1/100 sec
Aperture Value: f/7.1
Viewed 296 times
(4 times this week, 11 times this month, 76 times this year)