Wongm's Rail Gallery » Melbourne tram stop platform rebuilds

Difference in height between the raised (left) and original (right) sections of the platform stop

In album: Melbourne tram stop platform rebuilds

Difference in height between the raised (left) and original (right) sections of the platform stop

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 30 September 2014 08:45 AM
Exposure Time: 1/125 sec
Aperture Value: f/5.6
Viewed 562 times
(1 time this week, 1 time this month, 47 times this year)