Wongm's Rail Gallery » Melbourne tram stop platform rebuilds

Difference in height between the raised (left) and original (right) sections of the platform stop

In album: Melbourne tram stop platform rebuilds

Difference in height between the raised (left) and original (right) sections of the platform stop

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 3 October 2014 17:38 PM
Exposure Time: 1/100 sec
Aperture Value: f/7.1
Viewed 486 times
(4 times this week, 13 times this month, 39 times this year)