Wongm's Rail Gallery » Melbourne tram works

Operations staff in place to manually operate a defective set of points at the Elizabeth Street terminus

In album: Melbourne tram works

Operations staff in place to manually operate a defective set of points at the Elizabeth Street terminus

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 6 March 2017 13:06 PM
Exposure Time: 1/500 sec
Aperture Value: f/14
Viewed 710 times
(1 time this week, 2 times this month, 50 times this year)