Wongm's Rail Gallery » Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

Metro Trains Melbourne's Infrastructure Evaluation Vehicle IEV102 developed a brake issue in December 2016, with the T-IEV-T consist having having to be transferred back to Melbourne behind B76 and B80. In January IEV102 was transferred to Bendigo behind B76 and B80, with six freight wagons (BODX 2301C, BQCX 2202B, BQIX 2461D, IEV 102, BQCX 2201P, BQIX 2459V and BODX 2460V) along for the ride to counteract the unbraked carriage.

B80 and B76 waiting on the goods lines at Sunshine for a path north

Thursday 5 January 2017 8:04 AM
Viewed 750 times, 0 times this year)

B80 leads B76, three freight wagons, IEV102 and three more freight wagons north through Sunshine

Thursday 5 January 2017 8:11 AM
Viewed 707 times
(1 time this week, 1 time this month, 1 time this year)

IEV102 marshalled with three freight wagons either side

Thursday 5 January 2017 8:11 AM
Viewed 655 times, 0 times this year)

IEV102 marshalled with three freight wagons either side

Thursday 5 January 2017 8:11 AM
Viewed 726 times, 0 times this year)
Tags

Viewed 2293 times (1 time this week, 1 time this month, 11 times this year)