Wongm's Rail Gallery » Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

Metro Trains Melbourne's Infrastructure Evaluation Vehicle IEV102 developed a brake issue in December 2016, with the T-IEV-T consist having having to be transferred back to Melbourne behind B76 and B80. In January IEV102 was transferred to Bendigo behind B76 and B80, with six freight wagons (BODX 2301C, BQCX 2202B, BQIX 2461D, IEV 102, BQCX 2201P, BQIX 2459V and BODX 2460V) along for the ride to counteract the unbraked carriage.

B80 and B76 waiting on the goods lines at Sunshine for a path north

5 January 2017 08:04 AM
Viewed 378 times
(1 time this week, 7 times this month, 98 times this year)

B80 leads B76, three freight wagons, IEV102 and three more freight wagons north through Sunshine

5 January 2017 08:11 AM
Viewed 445 times
(1 time this week, 7 times this month, 109 times this year)

B80 leads B76, three freight wagons, IEV102 and three more freight wagons north through Sunshine

5 January 2017 08:11 AM
Viewed 363 times
(3 times this week, 8 times this month, 105 times this year)

IEV102 marshalled with three freight wagons either side

5 January 2017 08:11 AM
Viewed 344 times
(1 time this week, 7 times this month, 94 times this year)

IEV102 marshalled with three freight wagons either side

5 January 2017 08:11 AM
Viewed 369 times
(1 time this week, 7 times this month, 84 times this year)

IEV102 left behind at the SSR workshops at Bendigo, B76 leads B80 light engine through Sunshine on the up

5 January 2017 15:47 PM
Viewed 463 times
(1 time this week, 6 times this month, 122 times this year)
Tags

Viewed 1270 times (4 times this week, 23 times this month, 13 times this year)