Wongm's Rail Gallery » Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

IEV102 left behind at the SSR workshops at Bendigo, B76 leads B80 light engine through Sunshine on the up

In album: Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

IEV102 left behind at the SSR workshops at Bendigo, B76 leads B80 light engine through Sunshine on the up

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Thursday 5 January 2017 15:47 PM
Exposure Time: 1/1250 sec
Aperture Value: f/8
Viewed 868 times
(1 time this week, 1 time this month, 1 time this year)