Wongm's Rail Gallery » Metro Tunnel works at Arden

Cranes ready to assemble the tunnel boring machines

In album: Metro Tunnel works at Arden

Cranes ready to assemble the tunnel boring machines

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 20 March 2019 17:23 PM
Exposure Time: 1/500 sec
Aperture Value: f/16
Viewed 166 times
(2 times this week, 4 times this month, 59 times this year)