Wongm's Rail Gallery » Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

In album: Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 30 March 2019 09:19 AM
Exposure Time: 1/250 sec
Aperture Value: f/10
Viewed 162 times
(2 times this week, 4 times this month, 69 times this year)