Wongm's Rail Gallery » Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

In album: Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 20 July 2019 10:57 AM
Exposure Time: 1/640 sec
Aperture Value: f/16
Viewed 398 times
(1 time this week, 1 time this month, 17 times this year)