Wongm's Rail Gallery » Metro Tunnel works at Arden

Precast concrete tunnel segments ready to be lowered into the tunnel

In album: Metro Tunnel works at Arden

Precast concrete tunnel segments ready to be lowered into the tunnel

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 19 October 2019 16:01 PM
Exposure Time: 1/500 sec
Aperture Value: f/7.1
Viewed 240 times
(3 times this week, 13 times this month, 240 times this year)