Wongm's Rail Gallery » Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

In album: Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 29 December 2019 19:29 PM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 93 times
(4 times this week, 4 times this month, 93 times this year)