Wongm's Rail Gallery » Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

In album: Metro Tunnel works at Arden

Concrete batching plant at the Arden work site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 29 December 2019 19:29 PM
Exposure Time: 1/500 sec
Aperture Value: f/13
Viewed 83 times
(2 times this week, 2 times this month, 83 times this year)