Wongm's Rail Gallery » Metro Tunnel works at Arden

Access road to the North Melbourne Intake Substation

In album: Metro Tunnel works at Arden

The intake substation will transform incoming 66kV AC power to lower voltages to be used inside the tunnel
Access road to the North Melbourne Intake Substation

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 1 November 2020 00:41 AM
Exposure Time: 1/15 sec
Aperture Value: f/4
Viewed 87 times
(2 times this week, 4 times this month, 87 times this year)