Wongm's Rail Gallery » Metro Tunnel works at CBD South

Demolition works underway at the south end of Swanston Street for the future entrance to CBD South station

In album: Metro Tunnel works at CBD South

Demolition works underway at the south end of Swanston Street for the future entrance to CBD South station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 20 October 2017 13:53 PM
Exposure Time: 1/100 sec
Aperture Value: f/6.3
Viewed 690 times
(1 time this week, 2 times this month, 18 times this year)