Wongm's Rail Gallery » Metro Tunnel works at CBD South

Piling works continue at the City Square worksite

In album: Metro Tunnel works at CBD South

Piling works continue at the City Square worksite

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 12 October 2018 15:06 PM
Exposure Time: 1/800 sec
Aperture Value: f/14
Viewed 181 times
(1 time this week, 7 times this month, 52 times this year)