Wongm's Rail Gallery » Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

In album: Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 9 November 2018 13:55 PM
Exposure Time: 1/400 sec
Aperture Value: f/7.1
Viewed 453 times
(1 time this week, 1 time this month, 8 times this year)