Wongm's Rail Gallery » Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

In album: Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: 16 November 2018 13:24 PM
Exposure Time: 1/320 sec
Aperture Value: f/13
Viewed 474 times
(1 time this week, 1 time this month, 1 time this year)