Wongm's Rail Gallery » Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

In album: Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 17 November 2018 15:51 PM
Exposure Time: 1/640 sec
Aperture Value: f/14
Viewed 230 times
(1 time this week, 1 time this month, 66 times this year)