Wongm's Rail Gallery » Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

In album: Metro Tunnel works at CBD South

Demolition work underway at Federation Square for the future station entrance

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 19 November 2018 13:38 PM
Exposure Time: 1/500 sec
Aperture Value: f/13
Viewed 327 times
(2 times this week, 5 times this month, 82 times this year)