Wongm's Rail Gallery » Metro Tunnel works at CBD South

Piling works continue around the edge of the City Square site

In album: Metro Tunnel works at CBD South

Piling works continue around the edge of the City Square site

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: Monday 25 March 2019 13:11 PM
Exposure Time: 1/250 sec
Aperture Value: f/11
Viewed 407 times
(1 time this week, 1 time this month, 1 time this year)