Wongm's Rail Gallery » Metro Tunnel works at CBD South

Cranes and piling rigs ready to start work beside Young and Jacksons

In album: Metro Tunnel works at CBD South

Cranes and piling rigs ready to start work beside Young and Jacksons

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 4 April 2019 13:08 PM
Exposure Time: 1/250 sec
Aperture Value: f/10
Viewed 323 times
(1 time this week, 2 times this month, 45 times this year)