Wongm's Rail Gallery » Metro Tunnel works at CBD South

Installing the noise control deck over the City Square pit

In album: Metro Tunnel works at CBD South

Installing the noise control deck over the City Square pit

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: 25 May 2019 13:44 PM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 111 times
(1 time this week, 8 times this month, 44 times this year)