Wongm's Rail Gallery » Metro Tunnel works at CBD South

Installing the noise control deck over the City Square pit

In album: Metro Tunnel works at CBD South

Installing the noise control deck over the City Square pit

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 30 May 2019 17:07 PM
Exposure Time: 1/40 sec
Aperture Value: f/4
Viewed 316 times
(1 time this week, 2 times this month, 16 times this year)