Wongm's Rail Gallery » Metro Tunnel works at CBD South

Installing the noise control deck over the City Square pit

In album: Metro Tunnel works at CBD South

Installing the noise control deck over the City Square pit

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 5 June 2019 16:50 PM
Exposure Time: 1/100 sec
Aperture Value: f/7.1
Viewed 139 times
(2 times this week, 3 times this month, 23 times this year)