Wongm's Rail Gallery » Metro Tunnel works at CBD South

Piling works continue at the Federation Square site

In album: Metro Tunnel works at CBD South

Piling works continue at the Federation Square site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 17 June 2019 12:23 PM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 404 times
(1 time this week, 1 time this month, 41 times this year)