Wongm's Rail Gallery » Metro Tunnel works at CBD South

Crane at work building the noise control deck over the City Square pit

In album: Metro Tunnel works at CBD South

Crane at work building the noise control deck over the City Square pit

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 15 July 2019 14:17 PM
Exposure Time: 1/125 sec
Aperture Value: f/8
Viewed 313 times
(1 time this week, 1 time this month, 33 times this year)