Wongm's Rail Gallery » Metro Tunnel works at CBD South

Piling works continue at the Federation Square site

In album: Metro Tunnel works at CBD South

Piling works continue at the Federation Square site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Thursday 25 July 2019 12:44 PM
Exposure Time: 1/250 sec
Aperture Value: f/11
Viewed 503 times
(2 times this week, 2 times this month, 20 times this year)