Wongm's Rail Gallery » Metro Tunnel works at CBD South

Lift down to the bottom of the City Square shaft

In album: Metro Tunnel works at CBD South

Lift down to the bottom of the City Square shaft

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Friday 6 September 2019 13:40 PM
Exposure Time: 1/200 sec
Aperture Value: f/7.1
Viewed 374 times
(1 time this week, 1 time this month, 22 times this year)