Wongm's Rail Gallery » Metro Tunnel works at CBD South

Steel frame for the acoustic shed taking shape at the Federation Square site

In album: Metro Tunnel works at CBD South

Steel frame for the acoustic shed taking shape at the Federation Square site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 1 November 2019 13:08 PM
Exposure Time: 1/640 sec
Aperture Value: f/16
Viewed 322 times
(1 time this week, 1 time this month, 9 times this year)