Wongm's Rail Gallery » Metro Tunnel works at CBD South

Steel frame for the acoustic shed taking shape at the Federation Square site

In album: Metro Tunnel works at CBD South

Steel frame for the acoustic shed taking shape at the Federation Square site

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 25 November 2019 13:14 PM
Exposure Time: 1/320 sec
Aperture Value: f/11
Viewed 447 times
(1 time this week, 3 times this month, 14 times this year)