Wongm's Rail Gallery » Metro Tunnel works at CBD South

Acoustic shed still in place at the Federation Square shaft for now

In album: Metro Tunnel works at CBD South

Acoustic shed still in place at the Federation Square shaft for now

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 30 July 2022 15:24 PM
Exposure Time: 1/640 sec
Aperture Value: f/16
Viewed 152 times
(2 times this week, 3 times this month, 74 times this year)