Wongm's Rail Gallery » Metro Tunnel works at CBD South

Pair of tower cranes in place beside the City Square shaft and acoustic shed

In album: Metro Tunnel works at CBD South

Pair of tower cranes in place beside the City Square shaft and acoustic shed

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: Wednesday 14 September 2022 17:56 PM
Exposure Time: 1/320 sec
Aperture Value: f/10
Viewed 60 times
(1 time this week, 3 times this month, 21 times this year)