Metro Tunnel works at CBD South

'Town Hall' station is being constructed in the southern end of the Melbourne CBD, and will be connected to Flinders Street Station.

Pedestrian gates close on Collins Street, forcing someone already mid crossing to walk out onto the road

16 December 2019 14:39 PM
Viewed 155 times
(1 time this week, 3 times this month, 24 times this year)

Crane lifts a kibble of spoil out of the pit at Federation Square

16 December 2019 14:33 PM
Viewed 147 times
(1 time this week, 3 times this month, 25 times this year)

Wall cladding being added to the acoustic shed at Federation Square

16 December 2019 14:31 PM
Viewed 154 times
(1 time this week, 2 times this month, 22 times this year)

Truck exits the City Square site via Flinders Lane

12 December 2019 14:41 PM
Viewed 149 times
(1 time this week, 1 time this month, 28 times this year)

Metro Tunnel branded crane being erected at the Port Phillip Arcade work site

9 December 2019 13:37 PM
Viewed 133 times
(2 times this week, 4 times this month, 22 times this year)

Two mobile cranes and a boom lift at the Federation Square site

5 December 2019 15:32 PM
Viewed 149 times
(2 times this week, 3 times this month, 32 times this year)

Roof in place on the acoustic shed at the Federation Square site

4 December 2019 16:07 PM
Viewed 141 times
(2 times this week, 5 times this month, 38 times this year)

Excavator at the Port Phillip Arcade work site

4 December 2019 08:47 AM
Viewed 151 times
(2 times this week, 3 times this month, 26 times this year)

Gantry crane installed inside the acoustic shed frame at the Federation Square site

25 November 2019 13:16 PM
Viewed 211 times
(1 time this week, 12 times this month, 36 times this year)

Steel frame for the acoustic shed taking shape at the Federation Square site

25 November 2019 13:14 PM
Viewed 217 times
(1 time this week, 11 times this month, 35 times this year)

Pedestrians wait for the gates to open at the Metro Tunnel site entrance off Collins Street

15 November 2019 12:55 PM
Viewed 158 times
(2 times this week, 2 times this month, 35 times this year)

Inside the acoustic shed at City Square

11 November 2019 13:41 PM
Viewed 160 times
(2 times this week, 5 times this month, 44 times this year)

Loading a tip truck with dirt at the Young & Jacksons site

11 November 2019 13:33 PM
Viewed 140 times
(2 times this week, 2 times this month, 27 times this year)

With the acoustic shed complete, the Town Hall viewing windows now look at a concrete wall

8 November 2019 14:10 PM
Viewed 185 times
(1 time this week, 5 times this month, 44 times this year)

Unloading a truck inside the acoustic shed at City Square

8 November 2019 14:10 PM
Viewed 164 times
(1 time this week, 5 times this month, 49 times this year)

Excavation underway at the Port Phillip Arcade site

8 November 2019 13:59 PM
Viewed 135 times
(1 time this week, 2 times this month, 30 times this year)

Preparatory works underway along the closed off section of Flinders Street

8 November 2019 13:59 PM
Viewed 139 times
(2 times this week, 5 times this month, 42 times this year)

'Degraves access only' signage eastbound at Flinders and Elizabeth Street

8 November 2019 13:58 PM
Viewed 151 times
(3 times this week, 5 times this month, 35 times this year)

Preparatory works underway along the closed off section of Flinders Street

6 November 2019 13:43 PM
Viewed 121 times
(1 time this week, 4 times this month, 27 times this year)

Steel frame for the acoustic shed taking shape at the Federation Square site

6 November 2019 13:38 PM
Viewed 143 times
(6 times this week, 8 times this month, 47 times this year)

Steel frame for the acoustic shed taking shape at the Federation Square site

1 November 2019 13:11 PM
Viewed 126 times
(1 time this week, 2 times this month, 26 times this year)

Steel frame for the acoustic shed taking shape at the Federation Square site

1 November 2019 13:08 PM
Viewed 145 times
(2 times this week, 6 times this month, 36 times this year)

Tramway overhead on Flinders Street relocated to the edge of the tracks

To make room for tunnelling beneath Flinders Street

24 October 2019 10:02 AM
Viewed 166 times
(3 times this week, 7 times this month, 37 times this year)

Piling rig at work at the Port Phillip Arcade site

24 October 2019 10:02 AM
Viewed 190 times
(5 times this week, 17 times this month, 80 times this year)