Wongm's Rail Gallery » Metro Tunnel early works at South Kensington

McLeod Rail hi-rail excavator at work shifting rail in the sidings at North Dynon

In album: Metro Tunnel early works at South Kensington

The sidings were relocated to make room for the power lines, which had to be moved to make room for the tunnel portal
McLeod Rail hi-rail excavator at work shifting rail in the sidings at North Dynon

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 27 June 2018 10:28 AM
Exposure Time: 1/800 sec
Aperture Value: f/8
Viewed 857 times
(1 time this week, 7 times this month, 42 times this year)