Wongm's Rail Gallery » Metro Tunnel works at South Kensington

Work still ongoing to build new sidings at the north end of North Dynon

In album: Metro Tunnel works at South Kensington

Work still ongoing to build new sidings at the north end of North Dynon

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 22 July 2017 14:14 PM
Exposure Time: 1/250 sec
Aperture Value: f/7.1
Viewed 383 times
(2 times this week, 1 time this month, 56 times this year)