Wongm's Rail Gallery » Metro Tunnel works at South Kensington

Work still ongoing to build new sidings at the north end of North Dynon

In album: Metro Tunnel works at South Kensington

Work still ongoing to build new sidings at the north end of North Dynon

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 11 September 2017 08:43 AM
Exposure Time: 1/640 sec
Aperture Value: f/8
Viewed 407 times
(1 time this week, 6 times this month, 42 times this year)